Strategic Flood Risk Assessment & Water Cycle Strategy
Bromsgrove District and Redditch Borough Strategic Flood Risk Assessment - Level 1
Appendix A - Figures
- Figure 1 Bromsgrove District And Redditch Borough Boundaries
- Figure 2 River System And Development Sites
- Figure 3 Locations And Forms Of Historic Flooding
- Figure 6 Lidar Coverage
- Figure 7 Model And Gauges
- Figure 8 Flood Zones And Potential Development Sites
- Figure 9 Flood Zones And Potential Development Sites Bromsgrove
- Figure 11 Existing Flood Risk Management Measures
- Figure 12 100Yr CC Outlines
- Figure 13 Areas Of Concern
Appendix B Historic Flooding Tables
Appendix C - Hydraulic Models (Located within Final Report)
Appendix D - Guidance
- British Waterways Guidance
- Guidance Note Dealing With Surface Water
- Guidance Note Emergency Planning
- Guidance Note Exception Test
- Guidance Note Flood Risk Assessment Procedure
- Guidance Note Sequential Test
Appendix E - Data Register (Located within Final Report)
Bromsgrove District and Redditch Borough Strategic Flood Risk Assessment - Level 2
Bromsgrove District and Redditch Borough Water Cycle Strategy
The main objective of the Water Cycle Strategy (WCS) is to establish where constraints to development exist and to identify measures to eliminate or mitigate such constraints through the planning process. The WCS incorporates a strategic assessment of water resources and supply, sewerage and waste water treatment systems. The WCS has been completed alongside the SFRA and jointly with Redditch Borough Council. As with the Strategic Flood Risk Assessment, Bromsgrove District Council Officers, Redditch Borough Council Officers and Environment Agency have made comments and suggested changes on the draft WCS, which were then incorporated into the final report.