Strategic Flood Risk Assessment & Water Cycle Strategy
Bromsgrove District and Redditch Borough Strategic Flood Risk Assessment - Level 1
Appendix A - Figures
Figure 13 Areas Of Concern
Figure 12 100Yr CC Outlines
Figure 11 Existing Flood Risk Management Measures
Figure 9 Flood Zones And Potential Development Sites Bromsgrove
Figure 8 Flood Zones And Potential Development Sites
Figure 7 Model And Gauges
Figure 6 Lidar Coverage
Figure 3 Locations And Forms Of Historic Flooding
Figure 2 River System And Development Sites
Figure 1 Bromsgrove District And Redditch Borough Boundaries
Appendix B Historic Flooding Tables
Appendix C - Hydraulic Models (Located within Final Report)
Appendix D - Guidance
Guidance Note Sequential Test
Guidance Note Flood Risk Assessment Procedure
Guidance Note Exception Test
Guidance Note Emergency Planning
Guidance Note Dealing With Surface Water
British Waterways Guidance
Appendix E - Data Register (Located within Final Report)
Bromsgrove District and Redditch Borough Strategic Flood Risk Assessment - Level 2
Bromsgrove District and Redditch Borough Water Cycle Strategy
The main objective of the Water Cycle Strategy (WCS) is to establish where constraints to development exist and to identify measures to eliminate or mitigate such constraints through the planning process. The WCS incorporates a strategic assessment of water resources and supply, sewerage and waste water treatment systems. The WCS has been completed alongside the SFRA and jointly with Redditch Borough Council. As with the Strategic Flood Risk Assessment, Bromsgrove District Council Officers, Redditch Borough Council Officers and Environment Agency have made comments and suggested changes on the draft WCS, which were then incorporated into the final report.
Feedback & Share
Share this page on social media